{"id":15124,"date":"2016-07-18T07:01:20","date_gmt":"2016-07-18T07:01:20","guid":{"rendered":"https:\/\/multisite.itb.ac.id\/ftsl\/?page_id=15124"},"modified":"2018-08-27T09:57:56","modified_gmt":"2018-08-27T02:57:56","slug":"kompetisi-konstruksi-ramping-1-0","status":"publish","type":"page","link":"https:\/\/multisite.itb.ac.id\/ftsl\/agenda\/kompetisi-konstruksi-ramping-1-0\/","title":{"rendered":"KOMPETISI KONSTRUKSI RAMPING 1.0 \u2013 Fakultas Teknik Sipil dan Lingkungan"},"content":{"rendered":"<h3><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-15179\" src=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-2.png\" alt=\"Heading 2\" width=\"851\" height=\"315\" srcset=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-2.png 851w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-2-300x111.png 300w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-2-768x284.png 768w\" sizes=\"auto, (max-width: 851px) 100vw, 851px\" \/><\/strong><\/h3>\n<h3><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-15178 alignleft\" src=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-1-300x300.png\" alt=\"Heading 1\" width=\"166\" height=\"166\" srcset=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-1-300x300.png 300w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-1-150x150.png 150w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-1-768x768.png 768w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-1-1024x1024.png 1024w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Heading-1-160x160.png 160w\" sizes=\"auto, (max-width: 166px) 100vw, 166px\" \/><\/strong><\/h3>\n<h3><strong>\u00a0TEMPAT DAN TANGGAL<\/strong><\/h3>\n<p>Gedung CIBE<\/p>\n<p>Kampus ITB<\/p>\n<p>Jalan Ganesha, No 10 Bandung<\/p>\n<p>1 \u2013 2 Oktober 2016<\/p>\n<h3><strong>POSTER K2R<\/strong><\/h3>\n<p><a href=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-1-Konstruksi-Ramping.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-15190 size-large\" src=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-1-Konstruksi-Ramping-724x1024.jpg\" alt=\"Poster 1 Konstruksi Ramping\" width=\"720\" height=\"1018\" srcset=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-1-Konstruksi-Ramping-724x1024.jpg 724w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-1-Konstruksi-Ramping-212x300.jpg 212w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-1-Konstruksi-Ramping-768x1086.jpg 768w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/a> <a href=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-2-Konstruksi-Ramping.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-15191 size-large\" src=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-2-Konstruksi-Ramping-724x1024.jpg\" alt=\"Poster 2 Konstruksi Ramping\" width=\"720\" height=\"1018\" srcset=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-2-Konstruksi-Ramping-724x1024.jpg 724w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-2-Konstruksi-Ramping-212x300.jpg 212w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Poster-2-Konstruksi-Ramping-768x1086.jpg 768w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/a><\/p>\n<h3><strong>TENTANG KOMPETISI<\/strong><\/h3>\n<ul>\n<li><strong><em>Latar Belakang<\/em><\/strong><\/li>\n<\/ul>\n<p>Konstruksi Ramping atau Lean Construction adalah sebuah pendekatan yang diperkenalkan oleh Lauri J.Koskela, dari VTT Building and Transport di Finlandia, pada tahun 1992, dalam upayanya mencoba memperbaiki kinerja industri konstruksi dengan mengacu kepada kinerja yang dapat dicapai oleh industri manufaktur dengan pendekatan <em>Lean Production<\/em>-nya. Secara konseptual, kemudian Koskela mengembangkan filosofi dari Konstruksi Ramping ini dan dikembangkan lebih lanjut oleh masyarakat peneliti dan praktisi konstruksi yang tergabung dalam <em>International Group for Lean Construction<\/em> (IGLC) pada tahun 2013. Koskela dan kawan-kawan menitikberatkan awalnya pada proses produksi di lapangan, dengan adanya antara lain the Last Planner System (LPS), dan sampai saat ini sudah merambah kepada penyelenggaraan konstruksi secara holistik dengan Integrated Project Delivery-nya (IPD). Tujuan dari pendekatan Konstruksi Ramping ini adalah memaksimalkan nilai (value) yang ingin dicapai oleh pengguna akhir, namun dengan proses yang menghasilkan pemborosan (waste) minimal.<\/p>\n<p>&nbsp;<\/p>\n<p>Perkembangan selanjutnya dari Konstruksi Ramping sangat menakjubkan. Terdokumentasi dan terdiseminasi dalam bentuk konperensi tahunan IGLC, yang menampilkan hasil-hasil riset dan pengembangan terkait Konstruksi Ramping di berbagai negara, dan dalam bentuk seminar tahunan Lean in Public Sector (LIPS), yang menampilkan adopsi pemerintah berbagai negara terhadap pendekatan Konstruksi Ramping dan hasil positifnya. Di Indonesia, penelitian terkait dengan Konstruksi Ramping sudah dimulai sejak tahun 2005 secara resmi, dengan dimotori Kelompok Keahlian Manajemen dan Rekayasa Konstruksi di ITB yang mengusung Agenda Penelitiannya berupa \u201cMenuju Konstruksi Ramping di Indonesia\u201d. Interaksi dengan masyarakat internasional di bidang Konstruksi Ramping telah dibina pula sejak tahun 2007.<\/p>\n<p>Namun demikian, nampaknya, penyerapan masyarakat konstruksi di Indonesia terhadap Konstruksi Ramping ini tidak cepat dan luas. Dukungan pemerintah dan praktisi untuk implementasi Konstruksi Ramping dalam praktek konstruksi perlu ditingkatkan. Sosialisasi Konstruksi Ramping harus dilakukan lebih jauh dari sekedar di kalangan akademisi semata dan hanya pada satu institusi pendidikan saja. Berdasarkan kondisi tersebut, dibutuhkan sebuah sarana penyebaran Konstruksi Ramping ini yang efektif. Untuk itu, maka Kelompok Keahlian Manajemen dan Rekayasa Konstruksi ITB bermaksud untuk menyelenggarakan sebuah kompetisi antar perguruan tinggi di Indonesia terkait dengan konstruksi ramping<\/p>\n<ul>\n<li><strong><em>Maksud dan Tujuan<\/em><\/strong><\/li>\n<\/ul>\n<p>Adapun maksud dari kegiatan kompetisi ini adalah untuk meningkatkan pemahaman masyarakat konstruksi di Indonesia mengenai Konstruksi Ramping. Sedangkan tujuan dari kegiatan ini adalah:<\/p>\n<ol>\n<li>Menyebarluaskan pengetahuan terkait Konstruksi Ramping di kalangan mahasiswa, baik program sarjana maupun pascasarjana, di Indonesia.<\/li>\n<li>Memberikan tempat bagi mahasiswa untuk meningkatkan kemampuan mahasiswa dalam bekerjasama dalam sebuah tim.<\/li>\n<li>Menjadi salah satu wahana berkumpulnya akademisi peminat Konstruksi Ramping di Indonesia.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3><strong>KOMPETISI DAN SIMULASI<\/strong><\/h3>\n<ul>\n<li><strong><em>Kompetisi<\/em><\/strong><\/li>\n<\/ul>\n<p>Kegiatan kompetisi ini secara umum merupakan perlombaan untuk mengukur sejauh mana peserta kompetisi memahami beberapa konsep dan teknik Konstruksi Ramping yang diperkenalkan dalam sebuah simulasi proyek konstruksi. Terdapat dua kegiatan utama yang akan dinilai dalam kompetisi ini, yaitu <strong>Simulasi Proyek Konstruksi<\/strong> dan <strong>Presentasi<\/strong>.<\/p>\n<p>Adapun konsep dan teknik Konstruksi Ramping yang akan diperkenalkan adalah yang terkait dengan Sistem Perencana Akhir (SPA) atau <em>the Last Planner System<\/em> (LPS), yang meliputi <em>Collaborative Pull Planning<\/em>, <em>MakeReady<\/em>, <em>Production Evaluation &amp; Planning<\/em>, dan <em>Production management<\/em>.<\/p>\n<ul>\n<li><strong><em>Simulasi Proyek Konstruksi<\/em><\/strong><\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong>Kegiatan simulasi proyek konstruksi dilakukan dengan menggunakan blok-blok permainan LEGO. Akan terdapat permainan peran (role playing) dalam simulasi yang menggambarkan pihak-pihak yang terlibat dalam proyek konstruksi, yaitu 1 Kontraktor Utama, 6 Sub-kontraktor, 1 Pemasok, dan 1 Pengawas Keselamatan dan Kesehatan Kerja (K3).<\/p>\n<p>Tujuan simulasi proyek konstruksi ini adalah menghasilkan sebuah bangunan rumah yang memenuhi nilai (value) yang diinginkan oleh penggunanya, yaitu:<\/p>\n<ol>\n<li>Pelaksanaan yang cepat (waktu)<\/li>\n<li>Sesuai dengan desain (mutu)<\/li>\n<li>Tidak banyak terdapat pemborosan (biaya)<\/li>\n<\/ol>\n<ul>\n<li>Foto<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-15172\" src=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/IMG_0321-1-1024x575.jpg\" alt=\"IMG_0321\" width=\"720\" height=\"404\" srcset=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/IMG_0321-1-1024x575.jpg 1024w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/IMG_0321-1-300x169.jpg 300w, https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/IMG_0321-1-768x431.jpg 768w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/p>\n<p><a href=\"https:\/\/multisite.itb.ac.id\/ftsl\/kompetisi-konstruksi-ramping-1-0-2\/\">Foto Lainnya<\/a><\/p>\n<ul>\n<li>Video<\/li>\n<\/ul>\n<div style=\"width: 1280px;\" class=\"wp-video\"><!--[if lt IE 9]><script>document.createElement('video');<\/script><![endif]-->\n<video class=\"wp-video-shortcode\" id=\"video-15124-1\" width=\"1280\" height=\"720\" preload=\"metadata\" controls=\"controls\"><source type=\"video\/mp4\" src=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Video-Teaser-K2R-2015.mp4?_=1\" \/><a href=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Video-Teaser-K2R-2015.mp4\">https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/Video-Teaser-K2R-2015.mp4<\/a><\/video><\/div>\n<h3><\/h3>\n<h3><strong>PESERTA<\/strong><\/h3>\n<p>Kompetisi ini ditujukan kepada mahasiswa baik tingkat sarjana maupun pascasarjana. Terkait dengan bidangnya, karena tim proyek konstruksi itu bisa saja sangat kompleks, maka ditujukan bagi berbagai disiplin, namun demikian, <strong>pada tahap awal ini dibatasi hanya kepada mahasiswa Teknik Sipil dan Arsitek untuk program studi sarjana, dan mahasiswa yang mengambil bidang Manajemen Proyek atau Manajemen dan Rekayasa Konstruksi untuk program studi pascasarjana Teknik Sipil\/Arsitektur<\/strong>.<\/p>\n<p>Adapun persyaratan pesertanya adalah sebagai berikut:<\/p>\n<ol>\n<li><strong>Satu perguruan tinggi<\/strong> hanya dapat mengirimkan <strong>satu tim<\/strong>.<\/li>\n<li><strong>Satu tim<\/strong> terdiri <strong>7 orang<\/strong>. <strong>Minimal 1 orang mahasiswa prodi pascasarjana, dan minimal 4 orang mahasiswa prodi sarjana. Mahasiswa dapat merupakan gabungan dari Prodi Teknik Sipil dan Arsitektur.<\/strong><\/li>\n<li>Mahasiswa pascasarjana akan berperan sebagai kontraktor atau sub-kontraktor. Mahasiswa sarjana hanya boleh berperan sebagai sub-kontraktor.<\/li>\n<li>Semua peserta harus membawa dan menggunakan Alat Proteksi Pribadi atau Personal Protection Equipment (PPE) yang relevan sebagai bagian dari simulasi dalam kompetisi ini.<\/li>\n<li>Jumlah tim maksimum adalah 15 tim atau 15 Perguruan Tinggi. Tim peserta akan diseleksi terlebih dahulu oleh panitia. Tim yang tidak terseleksi dapat hadir sebagai pengamat atau observer.<\/li>\n<\/ol>\n<h3><\/h3>\n<h3><strong>PEMBUKAAN PENDAFTARAN PESERTA<\/strong><\/h3>\n<p>Formulir pendaftaran dapat diunduh pada tautan berikut <strong><a href=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/FORM-PENDAFTARAN.docx\">Registrasi.<\/a><\/strong> Pendaftaran dibuka hingga 15 September 2016<strong><br \/>\n<\/strong><\/p>\n<h3><\/h3>\n<h3><strong>TANGGAL PENTING<\/strong><\/h3>\n<p>Pendaftaran: 18 Juli \u2013 15 September 2016<\/p>\n<p>Pengumuman Hasil Seleksi Peserta: -akan diumumkan segera-<\/p>\n<p>Registrasi dan Pembayaran: Hingga 15 September 2016<\/p>\n<p>Kegiatan Kompetisi: 1 \u2013 2 Oktober 2016<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>PROGRAM KEGIATAN<\/strong><\/h3>\n<p>Jadwal Kegiatan<\/p>\n<p>Hari ke-1: Sabtu, 1 Oktober 2016<\/p>\n<table border=\"1\" width=\"636\">\n<thead>\n<tr>\n<td width=\"102\"><strong>Jam<\/strong><\/td>\n<td width=\"246\"><strong>Kegiatan<\/strong><\/td>\n<td width=\"258\"><strong>Lokasi<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"102\"><strong>07.30 \u2013 08.00<\/strong><\/td>\n<td width=\"246\">Pendaftaran Hari I<\/td>\n<td width=\"258\">Lobby Gedung CIBE, Lt. 1<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>08.00 \u2013 08.30<\/strong><\/td>\n<td width=\"246\"><strong>Pembukaan:<\/strong><\/p>\n<p>1.\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ketua Panitia K2R<\/p>\n<p>2.\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Direktorat Jenderal Bina Konstruksi (DJBK) Kementerian PUPR<\/p>\n<p>3.\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Dekan FTSL, ITB<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>08.30 \u2013 09.00<\/strong><\/td>\n<td width=\"246\">Materi Konstruksi Ramping (Keynote)<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>09.00 \u2013 09.30<\/strong><\/td>\n<td width=\"246\">Break<\/td>\n<td width=\"258\">R. CIBE 0101 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>09.30 \u2013 10.00<\/strong><\/td>\n<td width=\"246\">Penjelasan Kompetisi<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>10.00 \u2013 10.30<\/strong><\/td>\n<td width=\"246\">Undian dan Persiapan Kompetisi<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"102\"><strong>10.30 \u2013 12.00<\/strong><\/td>\n<td width=\"246\">Perencanaan Sesi 1<\/td>\n<td rowspan=\"2\" width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"246\">Kompetisi Hari I, Sesi 1: Tim 1, 2, dan 3<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>12.00 \u2013 13.00<\/strong><\/td>\n<td width=\"246\">Istirahat dan Makan Siang<\/td>\n<td width=\"258\">R. CIBE 0101 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"102\"><strong>13.00 \u2013 14.30<\/strong><\/td>\n<td width=\"246\">Perencanaan Sesi 2<\/td>\n<td rowspan=\"2\" width=\"258\">R. CIBE 0301, CIBE 0302, CIBE 0303 (Lt. 3)<\/td>\n<\/tr>\n<tr>\n<td width=\"246\">Kompetisi Hari I, Sesi 2: Tim 4, 5, dan 6<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"102\"><strong>14.30 \u2013 16.00<\/strong><\/td>\n<td width=\"246\">Perencanaan Sesi 3<\/td>\n<td rowspan=\"2\" width=\"258\">R. CIBE 0301, CIBE 0302, CIBE 0303 (Lt. 3)<\/td>\n<\/tr>\n<tr>\n<td width=\"246\">Kompetisi Hari I, Sesi 3: Tim 7, 8, dan 9<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>16.00 \u2013 16.30<\/strong><\/td>\n<td width=\"246\">Istirahat<\/td>\n<td width=\"258\">R. CIBE 0101 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>16.30 \u2013 17.00<\/strong><\/td>\n<td width=\"246\">Penjelasan The Last Planner System (Kompetisi Hari II)<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>17.00 \u2013<\/strong><\/td>\n<td width=\"246\">Istirahat<\/td>\n<td width=\"258\">Penginapan Masing-masing Tim<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Hari ke-2: Minggu, 2 Oktober 2016<\/p>\n<table border=\"1\" width=\"636\">\n<tbody>\n<tr>\n<td width=\"102\"><strong>Jam<\/strong><\/td>\n<td width=\"246\"><strong>Kegiatan<\/strong><\/td>\n<td width=\"258\"><strong>Lokasi<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>07.30 \u2013 08.00<\/strong><\/td>\n<td width=\"246\">Pendaftaran Hari II dan Undian<\/td>\n<td width=\"258\">Lobby Gedung CIBE, Lt. 1<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>08.00 \u2013 09.50<\/strong><\/td>\n<td width=\"246\">Kompetisi Hari II, Sesi 1: Tim 1, 2, dan 3<\/td>\n<td width=\"258\">R. CIBE 0301, CIBE 0302, CIBE 0303 (Lt. 3)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>10.00 \u2013 11.50<\/strong><\/td>\n<td width=\"246\">Kompetisi Hari II, Sesi 2: Tim 4, 5, dan 6<\/td>\n<td width=\"258\">R. CIBE 0301, CIBE 0302, CIBE 0303 (Lt. 3)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>12.00 \u2013 13.50<\/strong><\/td>\n<td width=\"246\">Kompetisi Hari II, Sesi 3: Tim 7, 8, dan 9<\/td>\n<td width=\"258\">R. CIBE 0301, CIBE 0302, CIBE 0303 (Lt. 3)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>11.00 \u2013 13.00<\/strong><\/td>\n<td width=\"246\">Istirahat dan Makan Siang<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>14.00 \u2013 14.30<\/strong><\/td>\n<td width=\"246\">Pengumuman dan Pemberian Penghargaan<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<tr>\n<td width=\"102\"><strong>14.30 &#8211; 15.00<\/strong><\/td>\n<td width=\"246\">Penutupan<\/td>\n<td width=\"258\">R. CIBE 0102 (Lt. 1)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>\u00a0<\/strong><\/p>\n<h3><strong>REGISTRASI DAN PEMBAYARAN<\/strong><\/h3>\n<ul>\n<li><strong><em>Biaya<\/em><\/strong><\/li>\n<\/ul>\n<p>Adapun biaya yang akan dibebankan kepada peserta adalah sebagai berikut:<\/p>\n<ol>\n<li>Biaya registrasi per tim sebesar Rp. 1.500.000, sudah termasuk makan siang 2 kali, kudapan 3 kali.<\/li>\n<li>Biaya penginapan ditanggung masing-masing tim.<\/li>\n<li>Biaya transportasi ditanggung masing-masing tim.<\/li>\n<\/ol>\n<p>Tidak ada biaya lain yang dipungut di lokasi terkait kegiatan ini. Segera setelah tahapan pembayaran selesai, peserta akan dikirimkan <em>Competition Kit<\/em><\/p>\n<ul>\n<li><strong><em>Registrasi<\/em><\/strong><\/li>\n<\/ul>\n<p>Formulir Registrasi dapat diunduh pada tautan berikut \u201c<strong><a href=\"https:\/\/multisite.itb.ac.id\/ftsl\/wp-content\/uploads\/sites\/8\/2016\/07\/FORM-PENDAFTARAN.docx\">registration<\/a><\/strong>\u201d.<\/p>\n<ul>\n<li><strong><em>Pembayaran<\/em><\/strong><\/li>\n<\/ul>\n<p>Pembayaran Biaya Registrasi dapat dilakukan melalui rekening <strong>Bank BNI Perguruan Tinggi Bandung <\/strong>dengan nomor rekening <strong>0454000060\u00a0 a.n Ima Fatima<\/strong><\/p>\n<ul>\n<li><strong><em>Konfirmasi<\/em><\/strong><\/li>\n<\/ul>\n<p>Bukti pembayaran dan formulir registrasi dapat di kirimkan melalui email ke alamat email <a href=\"mailto:imafatima@yahoo.com\">imafatima@yahoo.com<\/a>, <a href=\"mailto:nia_handayani@yahoo.com\">nia_handayani@yahoo.com<\/a>.\u00a0 Untuk informasi detail terkait kegiatan ini dapat menghubungi sekretariat.<\/p>\n<h3><strong>HADIAH (AWARD)<\/strong><\/h3>\n<ul>\n<li>Kinerja Total (setelah dikurangi penalti):\n<ol>\n<li>Urutan Pertama mendapatkan <strong><em>plakat<\/em><\/strong> dan hadiah uang Rp. 6.000.000<\/li>\n<li>Urutan Kedua mendapatkan <strong><em>plakat<\/em><\/strong> dan hadiah uang Rp. 4.500.000<\/li>\n<li>Urutan Ketiga mendapatkan <strong><em>plakat<\/em><\/strong> dan hadiah uang Rp. 3.000.000<\/li>\n<\/ol>\n<\/li>\n<\/ul>\n<h3><strong>HUBUNGI KAMI<\/strong><\/h3>\n<p>Adapun Sekretariat kegiatan ini adalah:<\/p>\n<p><strong>Kelompok Keahlian Manajemen dan Rekayasa Konstruksi<\/strong><\/p>\n<p>Gedung CIBE, Lt. 6<\/p>\n<p>Fakultas Teknik Sipil dan Lingkungan<\/p>\n<p>Institut Teknologi Bandung<\/p>\n<p>Jalan Ganesha No. 10, Bandung, 40132<\/p>\n<p>Contact Person: Nia Handayani<\/p>\n<p>Email: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 nia_handayani@yahoo.com<\/p>\n<p>Telpon: \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 081320619428<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<h3><strong>Sponsor<\/strong><\/h3>\n<p>Kegiatan ini didukung oleh <strong>Direktorat Jenderal Bina Konstruksi Kementerian Pekerjaan Umum dan Perumahan Rakyat<\/strong><\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Akomodasi<\/strong><\/h3>\n<p>Akomodasi Penginapan<\/p>\n<p>Panitia Menyarankan bagi peserta untuk memesan penginapan \u2013 penginapan berikut, dengan lokasi yang dekat dengan Kampus ITB:<\/p>\n<ol>\n<li>Wisma Dago \u2013 Hotel<\/li>\n<\/ol>\n<p>Jalan Ciung Wanara No.16, Jawa Barat<\/p>\n<p>Telepon: -022-2501356<\/p>\n<ol start=\"2\">\n<li>Sapadia \u2013 Guest House<\/li>\n<\/ol>\n<p>Jl. Munding Laya No.2, Lb. Siliwangi, Coblong, Kota Bandung, Jawa Barat<\/p>\n<p>Telepon: 022-2511011<\/p>\n<ol start=\"3\">\n<li>Puspa Kencana \u2013 Guest House<\/li>\n<\/ol>\n<p>Jl. Siliwangi No. 10, Dago, Coblong, Bandung, Jawa Barat<\/p>\n<p>Telepon: 022-2502599<\/p>\n<ol start=\"4\">\n<li>Sangkuriang \u2013 Guest House<\/li>\n<\/ol>\n<p>Jalan Sangkuriang No.11, Kelurahan Dago, Kecamatan Coblong, Kota Bandung, Jawa Barat<\/p>\n<p>Telepon: 022-2502169<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Panitia<\/strong><\/h3>\n<p>Berikut adalah susunan kepanitian kegiatan Kompetisi Konstruksi Ramping 1.0:<\/p>\n<p>Penaggung Jawab:<\/p>\n<ul>\n<li>Ade Sjafruddin (Dekan FTSL ITB)<\/li>\n<li>Krishna S. Pribadi (Ketua KK MRK)<\/li>\n<\/ul>\n<p>Pengarah:<\/p>\n<ul>\n<li>Rizal Z. Tamin<\/li>\n<li>Puti Farida Marzuki<\/li>\n<li>Biemo W. Soemardi (Kepala Lab. MRK)<\/li>\n<\/ul>\n<p>Ketua Pelaksana: Muhamad Abduh<\/p>\n<p>Wakil Ketua Pelaksana: Reini D. Wirahadikusumah<\/p>\n<p>Bendahara:\u00a0Ima Fatima<\/p>\n<p>Sekretaris: Nia Handayani<\/p>\n<p>Seksi Acara: Budi Hasiholan<\/p>\n<p>Seksi Penjurian:\u00a0Eliza Puri<\/p>\n<p>Seksi Konsumsi:\u00a0Iris Mahani<\/p>\n<p>Seksi Materi: Meifrinaldi<\/p>\n<p>Seksi Akomodasi dan Transportasi: Adrianto Oktavianus<\/p>\n<p>Seksi Dokumentasi:<\/p>\n<ul>\n<li>Wahana Adi Wibowo<\/li>\n<li>Farrel Adam<\/li>\n<li>Rahmat<\/li>\n<\/ul>\n<p>Seksi Promosi: Farrel Adam<\/p>\n<p>Seksi Kebersihan dan Keamaanan: Undang Ruhyana<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Apa Itu Lean Construction<\/strong><\/h3>\n<ul>\n<li><a href=\"http:\/\/www.villego.com\/\">Villego<\/a><\/li>\n<\/ul>\n<ul>\n<li><a href=\"http:\/\/www.leanconstruction.org\/\">Lean Construction<\/a><\/li>\n<\/ul>\n<ul>\n<li><a href=\"http:\/\/www.thechangebusiness.co.uk\/TCB\/Last_Planner_files\/LastPlanner2009-05-21.pdf\">Last Planner System<\/a><\/li>\n<\/ul>\n<ul>\n<li>Simulation Video<\/li>\n<\/ul>\n<p><iframe loading=\"lazy\" title=\"Villego Last Planner Simulation - Pull Planning - Lean Construction\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/hBn6O6stVjM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0TEMPAT DAN TANGGAL Gedung CIBE Kampus ITB Jalan Ganesha, No 10 Bandung 1 \u2013 2 Oktober 2016 POSTER K2R TENTANG KOMPETISI Latar Belakang Konstruksi Ramping atau Lean Construction adalah sebuah pendekatan yang diperkenalkan oleh Lauri J.Koskela, dari VTT Building and Transport di Finlandia, pada tahun 1992, dalam upayanya mencoba memperbaiki kinerja industri konstruksi dengan mengacu [&hellip;]<\/p>\n","protected":false},"author":41,"featured_media":0,"parent":14464,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-15124","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/pages\/15124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/users\/41"}],"replies":[{"embeddable":true,"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/comments?post=15124"}],"version-history":[{"count":29,"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/pages\/15124\/revisions"}],"predecessor-version":[{"id":15130,"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/pages\/15124\/revisions\/15130"}],"up":[{"embeddable":true,"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/pages\/14464"}],"wp:attachment":[{"href":"https:\/\/multisite.itb.ac.id\/ftsl\/wp-json\/wp\/v2\/media?parent=15124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}